Single-phase overhead (120/240) worst-case short circuit for sizing secondary interrupting equipments
Transformer kVA |
Z% |
240 volt short circuit |
25 |
1.3 |
8,000 |
37.5 |
1.3 |
12,000 |
50 |
1.3 |
16,000 |
75 |
1.3 |
24,000 |
100 |
1.3 |
32,000 |
167 |
1.6 |
43,000 |
250 |
1.7 |
61,000 |
333 |
1.5 |
93,000 |
Single-phase pad mount (120/240) worst-case short circuit for sizing secondary interrupting equipments
Transfer kVA |
Z% |
240 volt short circuit |
25 |
1.2 |
9,000 |
50 |
1.2 |
17,000 |
75 |
1.0 |
31,000 |
100 |
1.0 |
42,000 |
167 |
1.4 |
50,000 |
Three-phase overhead banked: worst-case short circuit for sizing secondary interrupting equipments.
Bank kVA |
Z% |
1/Z pu |
120/208 v short circuit |
120/240 v short circuit |
277/480 v short circuit |
30 |
1.3 |
77 |
6,000 |
6,000 |
3,000 |
45 |
1.3 |
77 |
10,000 |
8,000 |
4,000 |
75 |
1.3 |
77 |
16,000 |
14,000 |
7,000 |
112.5 |
1.3 |
77 |
24,000 |
19,000 |
10,000 |
150 |
1.3 |
77 |
32,000 |
28,000 |
14,000 |
225 |
1.3 |
77 |
48,000 |
42,000 |
21,000 |
300 |
1.3 |
77 |
64,000 |
56,000 |
28,000 |
500 |
1.6 |
63 |
87,000 |
75,000 |
38,000 |
750 |
1.7 |
59 |
122,000 |
106,000 |
53,000 |
1000 |
1.5 |
67 |
185,000 |
160,000 |
80,000 |
Three-phase pad-mount: worst-case short circuit for sizing secondary interrupting equipments.
Transformer kVA |
Z% |
120/208 volt short circuit |
277/480 v short circuit |
75 |
1.0 |
21,000 |
9,000 |
112.5 |
1.6 |
20,000 |
8,000 |
150 |
1.4 |
30,000 |
13,000 |
225 |
1.6 |
39,000 |
17,000 |
300 |
1.5 |
56,000 |
24,000 |
500 |
2.6 |
53,000 |
23,000 |
750 |
5.75 |
36,000 |
16,000 |
1000 |
5.62 |
49,000 |
21,000 |
1500 |
5.62 |
74,000 |
32,000 |
2500 |
5.62 |
123,000 |
54,000 |
-->