Accessory
Buildings -- Calling for Inspections
Please refer to PERMITS
for an overview of the permit process.
INDEX
TO THIS PAGE
CALLING
FOR INSPECTIONS
FOOTINGS
FRAMING
INSULATION
FINAL
CALLING
FOR INSPECTIONS
Requests for inspection are recorded
on the Building Inspection Selectron system by calling (303) 774-4595. You
will need your permit number and inspection card. Follow the voice mail prompts.
Inspections are usually made on the following day, it is wise to anticipate
when they need to be made to prevent delays.
No inspection will be made on subcontracted work done by an unlicensed subcontractor.
You should not proceed to cover-up
any work that has not been inspected. Although you may request either morning
or afternoon inspection times, it may not be possible to schedule a specific
time for the inspector to be there. You SHOULD NOT schedule any concrete or
other major work for the same day as the inspection to avoid costly problems.
Inspections must be called in the day before needed in order to efficiently
schedule and route the Field Inspectors.
Please have all animals including
dogs under control and not in the areas to be inspected. Inspections may not
be made if there are animals running loose and a re-inspection fee may be
required if this occurs.
The final inspection is the last
step in the inspection process, and is your certification that the work has
been satisfactorily completed according to building code.
Return
to Top
Footing
inspections requirements
- Site address posted during entire
construction.
- Inspection Record Card in plain
sight.
- Approved plans and site plan
on site.
- Lot Lines clearly marked with
string lines or otherwise.
- Footing/Foundation forms and
reinforcement in place.
- Erosion control in place.
Return
to Top
Framing
inspections requirements
- Inspection Record Card posted
on site.
- Approved plans on site.
- Engineer stamped and signed
truss plans.
- Trash enclosure on site to prevent
litter and blowing trash.
- Plumbing, Mechanical and Electrical
roughed in (if any).
- All framing, fire blocking and
bracing done.
- Plumbing/Mechanical/Electric
- Underground Plumbing, Gas Line,
Rough Plumbing, Mechanical and Electrical roughed in.
Return
to Top
Insulation
inspections requirements
- Inspection Record Card posted
on site.
- Any other work that may be covered
up inspected and approved.
- Insulation and Vapor retarder
installed.
Return
to Top
Final Inspection
requirements
- Inspection Record Card posted
on site.
- All Plumbing, Heating, Electrical
and Framing work done and approved.
- Final Grading and paving including
any required driveways done.
Return
to Top
-->