Online Scheduling - Click to beginInspection Scheduling Information

Online Inspection Scheduling System For Permit Holders

The City of Longmont has launched online system for Permit Holders to schedule inspections.

You may call our Building Inspection Hotline at (303) 774-4595 and schedule your inspection that way or use our Online Inspection Scheduling System.

Photo of inspector

Inspection times are not scheduled on the same day you access our system. All requests must be in before 4:00pm for an inspection on the next business day.

CANCELLING AN INSPECTION: If you need to cancel an inspection, you should do so before 4:00 p.m. the day before the inspection. For Monday inspections, please cancel by 4:00p.m. the previous Friday. If you miss these deadlines, please call our office before 8:30a.m. the day of the inspection.

When scheduling times for the next business day, it is wise to anticipate when inspections need to be made to prevent delays.

What the system allows you to do:

  • Schedule a day and time frame for each required inspection.
  • Cancel a previously scheduled inspection.
  • Reschedule previously scheduled inspection
  • View inspection results

If you access our Inspection Scheduling System, you will be prompted for the following information when scheduling an inspection.

Please have the following information at hand when using our scheduling system:

  • PERMIT NUMBER
  • PHONE NUMBER
  • ITEM # OF INSPECTION

No inspection will be made on subcontracted work done by an unlicensed subcontractor.


Scheduling Times:

Homeowners may request either morning or afternoon inspection times by accessing our system.

The final inspection is the last step in the inspection process, and is your certification that the work has been satisfactorily completed according to the building code.

Reminders:

For Homeowners:

Photo of HomeownersIn addition to requesting either a Morning or Afternoon inspection, you may request a specific time by calling the assigned inspector the morning of the inspection between 8:00 and 8:30a.m. (a short window of time where Inspectors are planning their day and can work with you regarding your desired timeframe).

The following main phone numbers may be accessed:

(BACK TO TOP)

Permit Holder - Inspection Checklist

A good rule of thumb is that you should not cover-up any work that has not been inspected.

FOR ALL INSPECTIONS:

FOR SPECIFIC TYPES OF INSPECTIONS:

Image of a framed buildingNote: Separate framing, insulation, electrical and plumbing inspections may be necessary if the interior walls and/or ceiling are covered and the structural framing and supports cannot be viewed at the final inspection.

FOOTING INSPECTIONS:

FOUNDATION INSPECTIONS:

ROUGH INSPECTIONS:

INSULATION INSPECTIONS (if needed):

DRYWALL NAIL INSPECTION (if needed for fire resistive assemblies; generally only required between a house and a garage):

FINAL INSPECTION (Sometimes in combination with framing inspection):

Boiler or Pressure Vessel Installation Inspections