Permit Fees
INDEX TO THIS PAGE
The Cost of Building
Permit Fees
Primary
Fee Table
Miscellaneous
Inspections and Fees
Foundation
Only Permits
Other
Permits: Residential and Commercial
Fire Permit Fees
City & County Sales Tax
Project
Valuation
Plan
Review Fees
Temporary
Certificate of Occupancy Fees
Investigation
Fees
Annual Elevator Inspection Fees
IMPORTANT: You MUST have the Adobe Acrobat Reader on your system prior to selecting the report in order to be able to view these files.
Public
Buildings Community Investment Fee
Transportation Community
Investment Fee
Electric Community
Investment Fees
Water
Meter Fees
Water
Tapping Materials Fees
Other
Fees
Water/Waste
Water Development Fees
IMPORTANT: You MUST have the Adobe Acrobat Reader on your system prior to selecting the report in order to be able to view these files.
The
Cost of Building Permit Fees
The cost of a building permit includes (but is not limited to): the building
permit fee, sales tax, and plan review fees.
Building Permit Fees
Permit fees are based on the project valuation. Building Inspection calculates
this based on the project’s gross floor area (square feet) or scope
of work multiplied by the applicable ICC “Building Valuation Data”
or RS Means “Building Construction Cost
Data.”
The ICC “Building Valuation Data” and RS Means “Building
Construction Cost Data” are
reviewed and adopted Longmont City Council annually. The “Building Valuation
Data” is developed by the International Code Council (ICC), updated
and
published semiannually in the their quarterly “Building Safety Journal.”
“Building Construction Cost Data” is updated and published annually
by RS Means. Both ICC
and RS Means provide “average” construction costs to assist jurisdictions
in estimating the value of a project.
• The building permit fee is calculated by applying
the determined project valuation or construction cost to the Primary
Fee Table of the Fee Schedule.
• Sales tax is calculated by multiplying 50% of the determined project
valuation (material costs) by the current city and country tax rate of 4.075%.
• The plan review fee is determined by applying the Plan
Review Fees of the fee schedule to the project.
The total fees due for a building permit include, but are not limited to,
the building permit
fee, city and county sales tax and a plan review fee. Other fees may be applicable
based on the type and scope of the project. Please consult with a Building
Inspection Division Permit Technician for assistance in determining the correct
total building permit fees due.
• The building permit fees can be paid by cash, check or credit card (Visa, Mastercard, American Express, or Discover).
Fee
Schedule
Primary
Fee Table
| Total
Valuation |
Fee
|
| $1.00
to $500.00 |
$27
|
| $501.00
to $2,000.00 |
$27
for the first $500.00 plus $3.50 for each additional $100.00 or fraction
thereof, to and including $2,000.00 |
| $2,001.00
to $25,000.00 |
$79.50
for the first $2,000.00 plus $16.10 for each additional $1,000.00 or
fraction thereof, to and including $25,000.00 |
| $25,001.00
to $50,000.00 |
$449.80
for the first $25,000.00 plus $11.61 for each additional $1,000.00 or
fraction thereof, to and including $50,000.00 |
| $50,001.00
to $100,000.00 |
$740.05
for the first $50,000.00 plus $8.05 for each additional $1,000.00 or
fraction thereof, to and including $100,000.00 |
| $100,001.00
to $500,000.00 |
$1,142.55
for the first $100,000.00 plus $6.44 for each additional $1,000.00 or
fraction thereof, to and including $500,000.00 |
| $500,001.00
to $1,000,000.00 |
$3,718.55
for the first $500,000.00 plus $5.46 for each additional $1,000.00 or
fraction thereof, to and including $1,000,000.00 |
| $1,000,001.00
and up |
$6,448.55
for the first $1,000,000.00 plus $4.20 for each additional $1,000.00
or fraction thereof. |
Return
to top
Combination
permit defined. A permit that is issued to the general contractor or the
primary contractor and includes the subcontractor's valuation and fees as
a part of the permit.
Only a combination
permit shall be issued where three or more trades are involved, such as plumbing,
electrical, mechanical and building. A combination permit shall include the
fees for electrical, mechanical, and plumbing work.
Exception:
The building official may allow separate permits to be issued when a general
contractor is not required for the scope of work involved, or when approved
by the building official.
Separate permits
When work is done by a subcontractor and is not part of a combination
permit, the valuation used to determine the permit fee will be based on the
actual contract value of the work being done.
Miscellaneous
Inspections and Other Fees
| Temporary
construction power |
$40.00
|
| Residential
service change |
$40.00
|
| Electrical
permit for signs-added to the sign permit |
$10.00
|
| Annual
certificate of inspection/elevators (installation fees include charges
for first year's annual inspection) |
$210.00
|
| Inspections
outside of normal business hours (minimum charge - two (2) hours) |
$47.00
per hour* |
| Reinspection
fees |
$47.00
per hour* |
| Inspections
for which no fee is specifically indicated (minimum charge one hour)
|
$47.00
per hour* |
| Additional
plan review required by changes, additions or revisions to plans (minimum
charge - one hour). |
$47.00
per hour* |
| Issuance
of new permit following suspension or abandonment of previously permitted
work (minimum charge - one hour) |
$47.00
per hour* |
| Issuance
of new permit for change of contractor on existing job (minimum charge
- one hour) |
$47.00
per hour* |
| Use
of outside consultants for plan checking and inspections, or both |
Actual
costs (including administrative and overhead costs) |
* Or the total
hourly cost to the city, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages, and benefits of the employees
involved.
Fees
for other miscellaneous permits and commercial work not listed above shall
be based on actual contract value of the work from the primary fee table.
Return
to top
Foundation
Only Permits
| One-
and two-family buildings |
$200.00
|
| Multi-Family buildings |
$300.00 |
| Commercial buildings |
$500.00 |
Return
to top
Other
Permits-Residential/Commercial
| Air
Conditioners* & Evaporative coolers |
$40.00
|
| Demolition
|
$50.00
(minor-interior)
$100.00
(major-building) |
Furnace
Replacement* & Boilers
|
$40.00
|
| Gas
Logs/ Gas Inserts/Gas Fireplaces |
$40.00
|
| Hot
Tubs & Above-Ground Pools |
$40.00
|
| Moving
|
$150.00
|
| Lawn
Sprinklers |
$30.00
|
| Residential
Elevator or Dumbwaiter |
$75.00
|
| Siding/Soffit/Fascia
|
$40.00
|
| Special
Event Signs |
$10.00
|
| |
|
| Thermal
Insulation |
$40.00
|
| Water
Heaters |
$40.00
|
| Wood
Burning Stoves/Fireplaces**/Inserts/Pellet Stoves |
$40.00
|
*
If permit application includes furnace and A/C, the fee is $50.00.
**
A surcharge of $250.00 is added for wood burning fireplaces.
Fees
for plumbing permits, mechanical permits, electrical permits, and other miscellaneous
permits and commercial work not listed above shall be based on actual contract
amount of the work from the primary fee table.
Return
to top
City
& County Sales Tax
City
& county sales tax is determined by project valuation or contract price
times 50% (estimated materials cost), times the current sales tax rates.
Return
to top
Project
Valuation
Project
valuation is determined by contract price, or cost per square foot as published
and periodically modified in Building Standards Magazine.
Return
to top
Plan
Review Fees
The
plan review fees specified in this section are separate fees from the permit
fees. Plan review fees are for staff review of the design of the proposed
construction to ensure all City codes are met.
| Plan
review fee-residential |
50%
of building permit fee
|
| Electrical,
plumbing, mechanical or elevator permit (not part of combination permit)
|
50%
of total permit fee
|
| Commercial
plan review |
65%
of building permit fee
|
| Additional
plan review (incomplete/changed submittal documents) |
$47
per hour
|
| Plan review
fees for "stock" or "repeat" plans (stock or repeat
plans are plans of buildings that have been reviewed and are subsequently
built in multiple locations) shall be assessed as follows: |
| One-
and two-family buildings |
$125.00
|
| Multifamily
buildings |
$150.00
|
Return
to top
Temporary
Certificate of Occupancy Fees
| For
all buildings or portions thereof - original and extension TCO |
$100.00/per TCO*
|
* |
$50.00 will be refunded if a certificate of occupancy is issued prior to the expiration of the temporary certificate of occupancy or any extensions thereof. |
Return
to top
Investigation
Fees
Whenever work
for which a permit is required is started before a permit is issued, an investigative
fee, equal to the cost of the permit fee, shall be paid whether or not a permit
is issued.
Annual Elevator Inspection Fees
A fee of $210 will be charged for the annual inspection of all elevators, escalators and moving walkways.
Contractor License Fees and Testing Fees
| License |
Fees/Yearly |
Inactive License Fees/Yearly |
| Class A |
$175.00 |
$60.00 |
| Class B |
$125.00 |
$50.00 |
| Class C |
$100.00 |
$40.00 |
| All others (M, P & D) except Electrical N/C |
$75.00 |
$30.00 |
| All Contractor Tests |
$100.00/ea |
|
Variance Requests
Board of Adjustment - 1 Family Dwelling |
$100.00 |
Board of Adjustment - Over 1 Family and Commercial |
$250.00 |
Board of Adjustement - Sign Variance |
$250.00 |
Board of Adjustment - Extension or reconstruction of non-conforming
use or structure |
$250.00 |
| Master Board of Appeals Hearing |
$75.00 |
Return
to top
Public
Buildings Community Investment Fee
The
amount of the Public Buildings Community Investment Fee shall be determined
by the following fee schedule: (Adjusts annually on March 1st.)
Effective April 5, 2010
| Residential
Single Family (per dwelling unit) |
$1036.99 |
| Residential
Multi Family (per dwelling unit) |
$1036.99 |
| Commercial
Building (per sq.ft. gross area) |
$0.368 |
| Industrial
Building (per sq.ft. gross area) |
$0.368 |
Return
to top
Transportation
Community Investment Fee
The
amount of the Transportation Investment Fee shall be determined by the following
fee schedule:
Effective
January 1, 2010
| Residential
Single Family or Duplex (per dwelling unit) |
$831.22 |
| Residential
Multi Family (per dwelling unit) |
$413.33 |
| Commercial
Building Low Trip Generator (per sq.ft. gross area) |
$1.0417 |
| Commercial
Building Medium Trip Generator (per sq.ft. gross area) |
$2.1152 |
| Commercial
Building High Trip Generator (per sq.ft. gross area) |
$3.1569 |
| Industrial
Building Low Trip Generator (per sq.ft. gross area) |
$0.5421 |
| Industrial
Building Medium Trip Generator (per sq.ft. gross area) |
$1.1054 |
| Industrial
Building High Trip Generator (per sq.ft. gross area) |
$1.6582 |
Return
to top
Electric Community
Investment Fees
For more information or questions on Electric Fees, visit Longmont Power and Communications
or call 303-651-8386.
Rate Class |
Voltage |
Phase |
Panel Amps |
CIF Charge |
| Miscellaneous Services |
120/240 |
1 |
Less than 100 |
$25 |
| Residential
|
| |
120/240 or 120/208 |
1 |
100 - 125 |
$310 |
| |
|
1 |
150, 200, 225 |
$619 |
| |
|
1 |
300, 400 |
$1,238 |
| |
|
1 |
500, 600 |
$1,858 |
| Non-Residential |
| |
120/240 or 120/208 |
1 |
100 |
$619 |
| |
|
1 |
200 |
$1,238 |
| |
|
1 |
400 |
$2,477 |
| Non-Residential
|
|
Voltage |
|
|
CIF Charge |
| |
120/208 or 120/240 |
3 |
100 |
$1,393 |
| |
|
3 |
200 |
$2,785 |
| |
|
3 |
400 |
$5,570 |
| |
|
3 |
600 |
$8,355 |
| |
|
3 |
800 |
$11,141 |
| |
|
3 |
1000 |
$13,926 |
| |
|
3 |
1200 |
$16,711 |
| |
|
3 |
1600 |
$22,281 |
| |
|
3 |
2000 |
$27,852 |
| |
|
3 |
2500 |
$34,815 |
| |
|
3 |
3000 |
$41,777 |
| |
|
3 |
3500 |
$48,740 |
| |
|
3 |
4000 |
$55,703 |
| |
|
3 |
5000 |
$69,629 |
| Non-Residential |
|
Voltage |
|
|
CIF Charge |
| |
277/480 or 204/480 |
3 |
200 |
$6,427 |
| |
|
3 |
400 |
$12,855 |
| |
|
3 |
600 |
$19,282 |
| |
|
3 |
800 |
$25,709 |
| |
|
3 |
1000 |
$32,136 |
| |
|
3 |
1200 |
$38,564 |
| |
|
3 |
1600 |
$51,418 |
| |
|
3 |
2000 |
$64,273 |
| |
|
3 |
2500 |
$80,341 |
| |
|
3 |
3000 |
$96,409 |
| |
|
3 |
3500 |
$112,478 |
| |
|
3 |
4000 |
$128,546 |
Water
Meter Fees
For more information or questions about water meter fees and sizing, contact the Public Works and
Natural Resources Department at 303-651-8468.
| Meter
Size |
Meter
Fee |
Warehouse
Handling Fee |
5/8" and 3/4" |
$64.50 |
$9.68 |
1"
|
$177.75
|
$26.66 |
1
½" |
$470.24 |
$70.54 |
2"
|
$603.26 |
$90.49 |
Return
to top
Water
Tapping Materials Fees
For more information or questions about water meter fees and sizing, contact the Public Works and
Natural Resources Department at 303-651-8468.
| Meter
Size |
Tapping
Fee |
| 5/8" & 3/4" |
$42.39
|
| 1"
|
$46.14
|
| 1
½" |
$76.53
|
| 2"
|
$99.06
|
Return
to top
Other
Fees
| Water
Pit Inspection Fee |
$15.00
|
| Sewer
Inspection Fee |
$15.00
|
| Electrical
Connect Fee |
$20.00
|
| Polycart
Escrow Fee |
$119.00
per residential unit ($42.50 for solid waste container and $76.50 for
recycling containers) |
| Parks
Improvement Fee |
$5105.00
per residential unit (as of 2/1/2011) |
| Ute
Creek Golf Development Fee |
$722.37
per residential unit
$0.1149 per impervious sq ft on multifamily & commercial |
| Storm
Drainage Fee |
$734.99
per single family permit, $.1169 per impervious square foot on multi-family
and non-residential permits (as of 2/1/2011) |
| Sewer
Tapping Materials Fee |
$40.00
|
| Air
Quality Permit Fee |
$250.00
|
| Street
Improvement Fee* |
$220.47
per single family residential unit, $133.63 per multi-family unit, $0.2395 per sq ft on commercial (specific development only) |
| Water
Use Construction Fee |
$40.00
|
*
applies only to specified projects
Return
to top
Water/Waste
Water Development Fees
For more information or questions about water meter fees and sizing, contact the Public Works and Natural Resources Department at 303-651-8468 or visit Public Works and Natural Resources
Water
Meter Size (Inches) |
Water
|
Wastewater
System Development Fee |
Total
Fees |
System
Development Fee |
Windy
Gap Surchage |
Total
|
Residential
|
5/8
" |
$3,750.00
plus $.50 per square foot of gross lot size
|
$1,300 |
|
$3,930 |
|
3/4" |
$4,920.00 plus $.50 per square foot of gross lot size |
$1,750 |
|
$5,310 |
|
1"
|
$7,320.00 plus $.50 per square foot of gross lot size |
$2,920 |
|
$8,840 |
|
Small
Commercial |
Water Meter Size (Inches) |
Water |
Wastewater System Development Fee |
Total Fees |
System Development Fee |
Windy Gap Surchage |
Total |
5/8" |
$9,990 |
$1,790 |
$11,780 |
$5,230 |
$17,010 |
| 3/4" |
$13,230 |
$2,420 |
$15,650 |
|
$22,650 |
1
|
$22,060 |
$4,040 |
$26,100 |
$11,710 |
$37,810 |
1
½ |
$44,080 |
$8,010 |
$52,090 |
$23,290 |
$75,380 |
2
|
$70,540 |
$12,840 |
$83,380 |
$37,290 |
$120,670 |
3
|
$141,050 |
$25,690 |
$166,740 |
$74,700 |
$241,440 |
Large
Commercial |
Negotiated
|
| |
Irrigation
|
|
5/8" |
$16,400 |
$2,920 |
$19,320 |
N/A
|
| 3/4" |
$21,740 |
$3,940 |
$25,680 |
1
|
$36,220 |
$6,580 |
$42,800 |
1
½ |
$72,400 |
$13,160 |
$85,560 |
2
|
$115,840 |
$21,110 |
$136,950 |
3
|
$231,880 |
$42,190 |
$274,070 |
4+
|
Negotiated
|
|
Multi-family
|
Number of Units
|
Per
each unit
|
Water
|
Windy
Gap Surchage |
Wastewater
|
Total
|
First
4 units |
$3,060 |
$580 |
$1,950 |
$5,590 |
Next
8 units |
$2,000 |
$370 |
$1,310 |
$3,680 |
Next
22 units |
$1,280 |
$240 |
$830 |
$2,350 |
Next
29 Units |
$1,180 |
$220 |
$760 |
$2,160 |
63
+ units |
$620 |
$110 |
$420 |
$1,150 |
| Mixed Use Other than Multifamily |
Number of Units |
Per each unit |
Water |
Windy Gap Surchage |
Wastewater |
Total |
| First 25 units |
$452 |
$81 |
$237 |
$770 |
| Next 65 |
$172 |
$31 |
$90 |
$293 |
| Next 160 |
$134 |
$24 |
$70 |
$228 |
| Next 280 |
$95 |
$16 |
$51 |
$162 |
| Over 531 |
$77 |
$14 |
$40 |
$131 |
Return
to top
Return
to top
Last Updated: 04/27/10
-->